Exterior Stucco Elastomeric Painting
Exterior Stucco Elastomeric Painting
Paint your home right now before the rain begins and holidays!
New painted exterior residence.
All walls and trims doors gutters fascias were painted custom color plus door. High quality paint product.
Freshly painted trims, doors eaves and gutter plus porch metal rails.
Finish product! after all the prepping and clean up. Painted walls ceilings trims and doors
Great work is accomplished by great preparation. We dilegently cover the surrounding areas to be painted before any work is done. In this case we are painting a Master Bathroom and Master Bedroom Walls Crim Trims and Doors.
Primed and painted the walls to highlight the redwood. Oakland CA.
Refinished kitchen cabinets from light oak to a lacquer white satin. Castro Valley CA
- Rick SI have been home owner for 28 years in San Francisco so I have had my home remodeled and painted several times so I have a fair amount of experience with contractors. I put out 5 inquiries in the Spring for a paint job estimate Bayardo was the 1st to respond and as it turned out had the most competitive bid. His crew did the job on schedule, were meticulous with detail and follow up. Next door neighbors were so impressed they hired FLEX to paint their house !
- Simon WWe needed to paint the exterior of our house and decided to go with Bayardo and Flex Painting. They helped inspect the exterior wood to see if they needed to be replaced due to dry rot. Luckily nothing needed to be replaced, just some minor repairs. Both Bayardo and Tony were able to complete the job in three days. They kept us informed on what they planned to do for the day and stayed on task. We just love the results!
- Vijay KI contacted Bayardo for removing the popcorn ceilings for my newly purchased home (built before 1980). Got quotes from other painters too, but none of them had any idea of what precautions to take when removing ceilings of this type that may have asbestos and lead in it. Bayardo, explained the entire procedure in detail, what they are going to do, including isolating the area, taping and covering the walls and floors, safely removing and disposing the materials, and even making sure that the air inside the house is clean from asbestos or other harmful remains. He also completed the work in time, in spite of other delays which included repairing couple of sections of the dry wall that was already damaged.
Mon: | 8:00 AM – 4:00 PM |
---|---|
Tue: | 8:00 AM – 4:00 PM |
Wed: | 8:00 AM – 4:00 PM |
Thu: | 8:00 AM – 4:00 PM |
Fri: | 8:00 AM – 4:00 PM |
Sat: | Closed |
Sun: | Closed |